Chuang, Bor-ren; 歐陽良裕; Ouyang, Liang-yuh; Lin, Yu-jen
,
2004 [管理科學學系暨研究所] 期刊論文 Yugoslav Journal of Operations Research 14(2), pp.247-258 cost. University of Belgrade, Faculty of Organizational Sciences Laboratory for Operations Research Inventory;defective items;setup cost;lead time
張紘炬; Chang, H. J.; Dye, Chung-yun
,
1999-11-01 [管理科學學系暨研究所] 期刊論文 Journal of the operational research society 50(11), pp.1176-1182 淡江大學經營決策學系 張紘炬 Chang, H. J. Dye, Chung-yun An EOQ Model for Deteriorating Items with Time Varying Demand and Partial Backlogging Palgrave Macmillan
莊忠柱
,
2001-12 [管理科學學系暨研究所] 期刊論文 Journal of the Operational Research Society of Japan 44(4), pp.301-312 time in the classical newsboy
problem, both the purchase timing and the time-variant variance of the forecasted demand are neglected
When the buyer
Po-Jen Chuang; Chih-Yuan Chou
,
2017-09 [電機工程學系暨研究所] 期刊論文 Journal of Applied Science and Engineering 20(3) ,p.355-365 cut down the overall runtime by using the R-B Tree structure to shorten the virtual CPU (VCPU) lookup time and attain efficient task scheduling
Cheng, Mei-Chuan; Chang, Chun-Tao; Ouyang, Liang-Yuh
,
2012-06-01 [統計學系暨研究所] 期刊論文, [經濟學系暨研究所] 期刊論文 Applied Mathematics and Computation 218(19), pp.9623–9634 a permissible delay in payments. The proper mathematical models are developed to find the optimal order quantity and payoff time for maximizing the retailer
Yang, Chih-Te; Ouyang, Liang-Yuh; Wu, Kun-Shan; Yen, Hsiu-Feng
,
2010-03 [企業管理學系暨研究所] 期刊論文 Journal of Scientific and Industrial Research 69(3), pp.180-187 time links to order quantity New Delhi: National Institute of Science Communication and Information Resources Inventory;Lead time;Temporary price
Chen, Jui-Fa; Lin, Wei-Chuan; Tsai, Kun-Hsiao; Dai, Shih-Yao
,
2011-09-01 [資訊工程學系暨研究所] 期刊論文 Tamkang Journal of Science and Engineering=淡江理工學刊 14(3), pp.255-264
accordance with guiding language offered by experts. Moreover, a method is needed to analysis the move-
ments of learners for a real-time guiding
徐煥智
,
2000 [資訊管理學系暨研究所] 研究報告
in many aspects throughout the software life cycle. For example, before software is
released for installation or distribution to customers, accurate
Wu, Jong-wuu; Tsai, Hui-yin
,
2001-02-01 [統計學系暨研究所] 期刊論文 International Journal of Systems Science 32(2), pp.259-268 淡江大學統計學系 Wu, Jong-wuu Tsai, Hui-yin Mixture inventory model with back orders and lost sales for variable lead time demand with the mixtures
Tsai, Chih-Chun; Lin, Chien-Tai; Balakrishnan, N.
,
2015-01-02 [資訊工程學系暨研究所] 期刊論文 IEEE Transactions on Reliability 64(2), p.603-612 Institute of Electrical and Electronics Engineers Cost function;optimal accelerated-stress acceptance testing time;optimal test plan;parameter
Chih-Hsien Hsia; Jen-Shiun Chiang; Chi-Fang Hsieh
,
2016-08 [電機工程學系暨研究所] 期刊論文 Multimedia Tools & Applications 75(16), p.9885-9902 ) and color-histograms for object detection. In order to reduce the search time, a new video synopsis search approach, a low-complexity range tree algorithm
歐陽良裕
,
2001 [管理科學學系暨研究所] 研究報告
cost. As we know from a product life cycle,
the demand rate remains stable only in the
maturity stage. Moreover, in time-based
competition today
林裕仁; Lin, Yu-jen
,
2005 [管理科學學系暨研究所] 學位論文 . In the inventory systems with controllable lead time, when unsatisfied demands occur, in order to reduce lost sales, we consider the supplier could
和家慧; Ho, Chia-huei
,
2005 [管理科學學系暨研究所] 學位論文 with controllable lead time 由於資訊科技的進步及競爭市場全球化的趨勢,供應鏈存貨管理逐漸發展成一重要的領域。供應鏈存貨管理的基本精神是有效整合同一條鏈上所有的合作夥伴,使得整體供應鏈利潤最大化或是成本最小化。因此,如何決定供應鏈上合作夥伴之間的庫存策略,達到整體供應鏈最
Teng, Jinn-tsair; 歐陽良裕; Ouyang, Liang-yuh; Chen, Liang-ho
,
2007-01 [管理科學學系暨研究所] 期刊論文 International Journal of Production Economics 105(1), pp.190-203 unit time between Abad's (2003) model and Goyal and Giri's [2003. The production-inventory problem of a product with time varying demand, production
Wu, Chung-yu; 鄭國興; Cheng, Kuo-hsing; Wang, Jinn-shyan
,
1993-01 [電機工程學系暨研究所] 期刊論文 IEEE Journal of Solid-State Circuits 28(1), pp.18-25 and the output node X is precharged to Voo.This
is the charge/evaluate phase of gate B. At this time, gate A
driving gate B is in the discharge/hold phase
Tseng, Sheng-tsaing; Balakrishnan, N.; Tsai, Chih-chun
,
2011-03 [應用數學與數據科學學系] 期刊論文 IEEE Transactions on Reliability 60(1), pp.234-245 by employing
one of four criteria: (i) maximization of the mean residual life-
time (MRL) of the product, (ii) achievement of a prescribed mis-
sion