Lee, Wen-chuan; 吳忠武; Wu, Jong-wuu
,
2002-06-01 [統計學系暨研究所] 期刊論文 International journal of information and management Sciences 13(2), pp.19-34 ;Probabilistic model;Minimum time;Exact solution;Sensitivity analysis 2002-06-01 en International journal of information and management Sciences 13(2
虞國興; 魏柏村
,
1994-07 [水資源及環境工程學系暨研究所] 會議論文 第七屆水利工程研討會論文集(上),頁[ D ] 137-148 淡江大學水資源及環境工程學系 虞國興 魏柏村 Yu, Gwo-Hsing Wei, B. T. 水文時間序列補遺之研究 Interpolation of the Missing Data in Hydrologic Time Series 水文測量;水文資料;水文時序;時間序列分析
Lin, Heng-Wen; Pan, Kuang-Min; Tsai, Chien-Lu
,
2015-06-29 [體育事務處] 會議論文 33 International Conference of Biomechanics in Sports (2015) the differences between two kinds of forward step movements. The results showed that the movement time for 3-step movement was significantly faster than
Chang, W. T.; Peng, C.Y.; Wang, H. Paul; 彭晴玉
,
2015-04-27 [水資源及環境工程學系暨研究所] 會議論文 Jade Mountain Forum on Sustainable Environment and Environmental Nano-Technology Conference Proceeding and Guest Address ಃᄽᖱ࠻
Conference Roo
09Ǻ50ɴ10Ǻ00
ύҶ৲(ૡ) Break Time ୯ሞύЈ
International Conference Hall
10Ǻ00ɴ10Ǻ30
Mau, Lih-wen
,
2022-09-25 [高齡健康管理學研究所] 期刊論文 Transplantation and Cellular Therapy 28(12), p.852-858 estimated need and unmet need from 2010 to 2015 and over different time periods were evaluated for both approaches. The alloHCT rate within 180 days
蔡百里; Tsai, Bai-li
,
2006 [運輸管理學系暨研究所] 學位論文 淡江大學運輸管理學系碩士班 羅孝賢; Luo, Shiaw-shyan 蔡百里 Tsai, Bai-li 資料融合技術應用於旅行時間推估之研究 A study on travel time estimation applications of data fusion techniques 移動式
Rao, A. Ramachandra; Yu, Gwo-hsing
,
1986-09 [水資源及環境工程學系暨研究所] 期刊論文 Management Science 32(9), pp.1206-1217 淡江大學水資源及環境工程學系 Rao, A. Ramachandra Yu, Gwo-hsing 虞國興 Detection of nonstationarity in hydrologic time series Catonsville: Institute for Operations
Chen, Yulin; Kondo, Mayu; Mouri, Katsuhiro; Yasuda, Takami
,
2009-12 [大眾傳播學系暨研究所] 會議論文 Proceedings of 2009 Fourth International Conference on Innovative Computing, Information and Control, pp.776-779 space concept, and developed a news timeline to construct an interactive astronomy visualization system that integrates time and spatial concepts. Before
Wu, Kun-Shan; Ouyang, Liang-Yuh; Yang, Chih-Te
,
2009-12 [企業管理學系暨研究所] 期刊論文 International Journal of Systems Science 40(12), pp.1273-1281 is to determine the optimal selling price and the length of replenishment cycle such that the total profit per unit time has a maximum value for the retailer
蔣樹民; Chiang, Shu-min
,
1966-01 [電機工程學系暨研究所] 期刊論文 Engineer and sciences. chinese naval institute of technology 2, pp.46-56 systems, one often encounters a type of time delay called transportatuon leg or dead time. It is highly disirable to investigate the effects
李明宣; Lee, Ming-Hsuan
,
2012 [統計學系暨研究所] 學位論文 for the analysis of right-censored failure time data in the past 30 years. In a medical follow-up study, additional problems arise in the analysis of interval
陳郁彬
,
2014-06 [英美語言文化學系] 會議論文 the age of two to the age of three. Following Ervin-Tripp et al.’s study, conversations observed at three time points were investigated for social
林渠洋; Lin, Chyu-yang
,
2005 [應用數學與數據科學學系] 學位論文 , expectation, variance, and confidence interval of the estimation of the parameter when the distribution of lifetime is exponential. 2005 [1] B. Epstein
王凰妃; Wang, Huang-fei
,
2006 [應用數學與數據科學學系] 學位論文 number of failures or take a long time for observating the expected number of failure in the life test. To prevent the defect of the shortcoming
Pang, Ning-Ning; Tzeng, Wen-Jer
,
2010-09 [物理學系暨研究所] 期刊論文 Physical Review E 82(3), 031605(24pages) , and the local roughness exponent αloc), based on the scaling of S(r,t) and w[Q](l,t), are very reliable and rarely influenced by the finite time and/or finite
Chuang, Bor-ren; 歐陽良裕; Ouyang, Liang-yuh; Lin, Yu-jen
,
2004 [管理科學學系暨研究所] 期刊論文 Yugoslav Journal of Operations Research 14(2), pp.247-258 cost. University of Belgrade, Faculty of Organizational Sciences Laboratory for Operations Research Inventory;defective items;setup cost;lead time
張紘炬; Chang, H. J.; Dye, Chung-yun
,
1999-11-01 [管理科學學系暨研究所] 期刊論文 Journal of the operational research society 50(11), pp.1176-1182 淡江大學經營決策學系 張紘炬 Chang, H. J. Dye, Chung-yun An EOQ Model for Deteriorating Items with Time Varying Demand and Partial Backlogging Palgrave Macmillan
莊忠柱
,
2001-12 [管理科學學系暨研究所] 期刊論文 Journal of the Operational Research Society of Japan 44(4), pp.301-312 time in the classical newsboy
problem, both the purchase timing and the time-variant variance of the forecasted demand are neglected
When the buyer
Po-Jen Chuang; Chih-Yuan Chou
,
2017-09 [電機工程學系暨研究所] 期刊論文 Journal of Applied Science and Engineering 20(3) ,p.355-365 cut down the overall runtime by using the R-B Tree structure to shorten the virtual CPU (VCPU) lookup time and attain efficient task scheduling