Hsiao, Ying-Tung; Chuang, Cheng-Long; Chien, Cheng-Chih
,
2004-09 [電機工程學系暨研究所] 會議論文 Computer Aided Control Systems Design, 2004 IEEE International Symposium on, pp.321-326 response by minimizing the integral absolute control error. At the same time, the transient response is guaranteed by minimizing the maximum
Chii-Dong Ho; Ho-Ming Yeh; Wen-Pen Wang
,
2000-04-17 [化學工程與材料工程學系暨研究所] 期刊論文 Tamkang Journal of Science and Engineering 3(3), pp.157-164 淡江大學化學工程與材料工程學系 Chii-Dong Ho Ho-Ming Yeh Wen-Pen Wang Cool Thermal Discharge from Ice Melting with Time-Velocity Variation of Flowing Air
Chii-Dong Ho; Ho-Ming Yeh; Jr Wei Tu; Ying-Sian Su
,
2005-12 [化學工程與材料工程學系暨研究所] 期刊論文 Tamkang Journal of Science and Engineering 8(4), p.291-298 Air under Time-Velocity Variations and External Recycle Tamkang University Heat Transfer;Cool Thermal Discharge;Chilled Air;External Recycles
Huang, Yulan; Chang, Dian-Fu
,
2016-07-13 [教育政策與領導研究所] 會議論文 Proceeding . Secondly, the variables of gender and faculty registration did not influence how much time was spent on these two games, indicating that mobile game-based
Shiaw-Shyan Luo; Chung-Yung Wang; Yi-Wei Sung
,
2018-06 [運輸管理學系暨研究所] 期刊論文 European Journal of Operational Research 267(2), p415-427 Shiaw-Shyan Luo Chung-Yung Wang Yi-Wei Sung Time-dependent trip-chain link travel time estimation model with the first-in-first-out constraint
Lin, Chi-Yi; Jhu, Guan-Ying; Siao, Siang
,
2019-08 [資訊工程學系暨研究所] 會議論文 their waiting time using smartphones, which distracts them from noticing the call. In this research, we take advantage of the fact that people pay more attention
Jianhe Shen; Cheng-Hsiung Hsu; Ting- Hui Yang
,
2019-03-25 [應用數學與數據科學學系] 期刊論文 Journal of Dynamics and Differential Equations 32, p.895–920 predator induces evolution of it to the intraguild predator, then the system can be viewed as a singularly perturbed problem with two different time scales
Fan, Su-Ling; Sun, Kuo-Shun; Wang, Yu-Ren
,
2012-01 [土木工程學系暨研究所] 期刊論文 Automation in Construction 21, P.253-261 ;Soft logic;Time–cost trade-off;Genetic algorithms This paper presents a Genetic Algorithm (GA) based optimization model for repetitive projects when
Lee, Yang-han
,
2019-07-04 [電機工程學系暨研究所] 期刊論文 Microsystem Technologies 27(4), p.1711-1720 and navigating. The information received at that time was different from the actual situation, so the target object could not be accurately located. Thus
Chen, Yi-Cheng; Hui, Lin; Thaipisutikul, Tipajin
,
2020-04 [資訊工程學系暨研究所] 期刊論文 The Journal of Supercomputing 77, pp.244-262 Chen, Yi-Cheng Hui, Lin Thaipisutikul, Tipajin A collaborative filtering recommendation system with dynamic time decay Springer Nature
Lin, Chih-kang
,
20141-06-22 [運輸管理學系暨研究所] 期刊論文 Engineering Optimization 44(9), p.1035-1055 work schedule;time-space network;multiple-commodity network flow problem;heuristic The completion of every disaster rescue task performed by repair
Chen, Chun-ying; Chen, Yu-hsin
,
2024-12-04 [運輸管理學系暨研究所] 期刊論文 International Journal of Civil Engineering analyses. The results show that when the allowable delay time increases, the number of flights that cannot be implemented decreases. However, this decrease
Huang, Yih-huei; Wu, Chien-ying
,
2024-12-30 [應用數學與數據科學學系] 期刊論文 Statistics in Medicine 43(30), p.6073-6085 Huang, Yih-huei Wu, Chien-ying A Nonparametric Regression Calibration for the Accelerated Failure Time Model With Measurement Error accelerated