麥朝成; Mai, Chao-cheng; Hwang, Hong
,
2004-09 [產業經濟學系暨研究所] 期刊論文 Environmental and Resource Economics 29(1), pp57-65 ). Washington, DC: USGPO.
White, M. J. and D. Wittman (1982), `Pollution Taxes and Optimal Spatial Location', Economica 49, 297–311.
Xing, Y. and C. D
柯碧珍; Ko, Pi-Chen
,
2011 [管理科學學系暨研究所] 學位論文 ., Baack, D., & Fogliasso, C. (1998). Reducing perceived risk through advertising service quality cues. Journal of Professional Services Marketing, 16(2
Wong, Ching-chang; Lin, Bo-chen; Cheng, Chi-tai
,
2001-12 [電機工程學系暨研究所] 會議論文 Fuzzy Systems, 2001. The 10th IEEE International Conference on, pp.103-106 , pp.2747-2751, 1997.
[7] K.H. Wo, C. H. Chen, and J. D. Lue, “Genitic-based adaptive fuzzy controller for robet peth plunning,'' IEEE International
Liao, Shu-hsien; Hsieh, Chia-lin
,
2010-04 [管理科學學系暨研究所] 期刊論文 Lecture Notes in Computer Science 6457, pp.533-542 unit population per day(d ) k Lead time (days) (L ) jk
Unit ship. cost from supplier i to DC j (c ) ij
吳忠武; Wu, Jong-wuu; Lee, Wen-Chuan; Tsai, Hui-yin
,
2004-05 [統計學系暨研究所] 期刊論文 International Transactions in Operational Research 11(3), pp.341-359 : Because the expected langth of the cycle time is E(T) 5 [E(Q Z)]/D, thus the expected total
annual cost is D
EACNðQ; r; LÞ¼U½C
Ducrot, Arnaud; Guo, Jong-Shenq
,
2018-06 [應用數學與數據科學學系] 期刊論文 Journal of Evolution Equations, 18, 755-775 by C BR C2(BR), −(D + (x)) = R in BR, (3.7) = 0on∂ BR and >0inBR.
Recalling from the result
Chang, Chun-Tao; Ouyang, Liang-Yuh
,
2017-02 [管理科學學系暨研究所] 期刊論文 Journal of Applied Analysis and Computation 7(1), p.224-235 C Production cost per item including inspection cost d The production rate of imperfect items during the regular production