淡江大學機構典藏:搜尋結果
English  |  正體中文  |  简体中文  |  全文筆數/總筆數 : 64185/96959 (66%)
造訪人次 : 11342194      線上人數 : 1249
RC Version 7.0 © Powered By DSPACE, MIT. Enhanced by NTU Library & TKU Library IR team.
搜尋範圍 查詢小技巧:
  • 您可在西文檢索詞彙前後加上"雙引號",以獲取較精準的檢索結果
  • 若欲以作者姓名搜尋,建議至進階搜尋限定作者欄位,可獲得較完整資料
  • 進階搜尋

    類別瀏覽

    正在載入社群分類, 請稍候....

    作者瀏覽

    正在載入作者分類, 請稍候...

    年代瀏覽

    正在載入年代分類, 請稍候....

    結果 761-785 / 16823.

    上一頁22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 下一頁    每頁顯示[10|25|50]項目
    [ 只搜尋有全文項目| 搜尋所有項目]     排序欄位 順序

    761(Q, R, L) inventory model involving a service level constraint with defective items

    Ouyang, Liang-yuh; Chuang, Bor-ren2001-05-01
    [管理科學學系暨研究所] 期刊論文
    Journal of information & optimization sciences 22(2), pp.213-225
    . It also considers a continuous review inventory model with a mixture of backorders and lost sales, where the order quantity, reorder point and lead time

    762The effects of investing in lost sales reduction on the stochastic inventory models

    Ouyang, Liang-yuh; Chang, H. C.2001-05-01
    [管理科學學系暨研究所] 期刊論文
    Journal of information & optimization sciences 22(2), pp.357-368
    the feasibility of investing in reducing the lost sales caused by stockout. We first assume that the lead time demand follows a normal distribution

    763A Minimax Distribution Free Procedure for (T,R,L) Inventory Model

    歐陽良裕; Ouyang, Liang-yuh; 1999-06
    [管理科學學系暨研究所] 期刊論文
    International journal of information and management Sciences 10(2), pp.13-23
    ;Lead Time;Target Level;Minimax Distribution;Free Procedure;Setup Cost Reduction The purpose of this study is to generalize Ouyang and Chuang's [8

    764Nagumo type existence results for second-order nonlinear dynamic BVPS

    錢傳仁; Chyan, Chuan-jen; 2005-01-01
    [應用數學與數據科學學系] 期刊論文
    Nonlinear Analysis: Theory, Methods & Applications 60(2), pp.209-220
    condition; Lower and upper solutions; Time scales In this paper, we present a Nagumo condition for time scales equations that includes as a particular case

    765微陣列時間序列資料中之遺失值填補與基因調控關係預測

    許輝煌2010
    [資訊工程學系暨研究所] 研究報告
    淡江大學資訊工程學系 許輝煌 微陣列時間序列資料中之遺失值填補與基因調控關係預測 Missing Value Imputation and Gene Regulation Prediction with Microarray Time Series Data 微陣列; 調控基因; 動態時間配置

    766以 Matlab 為平台進行可見光域即時目標辨視及追蹤

    蕭富元2010
    [航空太空工程學系暨研究所] 研究報告
    淡江大學航空太空工程學系 蕭富元 以 Matlab 為平台進行可見光域即時目標辨視及追蹤 Real-Time Target Recognition and Tracking in Visible Spectrum Using Matlab Platform 即時目標辨視; 視訊導航; 無人飛行器

    767A period review inventory-control system with variable lead time

    Ouyang, Liang-yuh; 歐陽良裕; 2001-03
    [管理科學學系暨研究所] 期刊論文
    International journal of information and management sciences 12(1), pp.1-13
    淡江大學經營決策學系 Ouyang, Liang-yuh 歐陽良裕 Chuang, B. R. A period review inventory-control system with variable lead time We propose a periodic review

    768A Room of Images: The Subjectivity of Time in Virginia Woolf

    郭家珍2011
    [英文學系暨研究所] 學位論文
    淡江大學英文學系 郭家珍 A Room of Images: The Subjectivity of Time in Virginia Woolf 影像的房間:維吉尼亞.吳爾芙的時間主體性 臺北市:臺灣大學外國語文學研究所 德勒茲;吳爾芙;柏格森;電影;時間影像;流變;任意空間;Gilles

    769非常態水文時序之預測

    虞國興; 溫文正1995-03
    [水資源及環境工程學系暨研究所] 期刊論文
    臺灣水利=Taiwan Water Conservancy 43(1)=169,頁56-69
    淡江大學水資源及環境工程學系 虞國興 溫文正 非常態水文時序之預測 A methodology for forecasting non-gaussian hydrological time series 臺中市:臺灣水利出版委員會 非常態水文時序;預測;Non-Gaussian

    770線性與非線性時序之判定--序列分離理論之應用

    虞國興; 魏柏村2001-12
    [水資源及環境工程學系暨研究所] 期刊論文
    臺灣水利=Taiwan Water Conservancy 49(4)=196,頁24-34
    淡江大學水資源及環境工程學系 虞國興 魏柏村 線性與非線性時序之判定--序列分離理論之應用 Identification of Non-linear Time Series--Time Series Decomposition Method 臺中市:臺灣水利出版委員會 非線性時間序列;序列分離理

    771Level Models Automation for Virtual Environment

    Huang, Jiung-Yao; Cheng, Shing-Ping; 1995-07
    [資訊工程學系暨研究所] 會議論文
    第一屆即時與媒體系統研討會論文集=Proceedings of First Workshop on Real-Time and Media Systems,頁63-69
    =Proceedings of First Workshop on Real-Time and Media Systems,頁63-69 第一屆即時與媒體系統研討會=First Workshop on Real-Time and Media Systems 中央研究院; 工業技術研究院; 交通部電信總局 http

    772Generalized Rate Monotonic Schedulability Bounds Using Relative Period Ratios

    Wei, Hsin-Wen; Lin, Kwei-Jay; 2008-08
    [電機工程學系暨研究所] 期刊論文
    Information Processing Letters 107(5), pp.142–148
    Amsterdam: Elsevier BV Real-time systems; Rate monotonic analysis; Schedulability conditions One of the most well-studied scheduling algorithms for real

    773A Multi-Agents Coordination Mechanism to Improving Real-Time Strategy on Tower Defense Game

    Lo, Steven K.C.; Keh, Huan-Chao; 2013-08-01
    [資訊工程學系暨研究所] 期刊論文
    Journal of Applied Sciences 13(5), pp.683-691
    淡江大學資訊工程學系 Lo, Steven K.C. Keh, Huan-Chao Chang, Chia-Ming A Multi-Agents Coordination Mechanism to Improving Real-Time Strategy on Tower Defense

    774Low Earth Orbit Constellations Design with Good Dilution of Precision

    Ma, Der-Ming1995-08-14
    [航空太空工程學系暨研究所] 會議論文
    of user time and user position. In the paper he low Earth orbit satellite constellation satisfying the time requirements and having good GDOP over

    775Simulation of Theme Park Queuing System by using ARENA

    Chu, Liou; Hui, Lin; 2013-10
    [資訊創新與科技學系] 會議論文
    decreasing customer satisfaction. Visitors spend much time standing and waiting for the rides. If the visitors can register in a virtual queue

    776Buddai y el gigante durmiente aborigen de Australia

    Fernando Darío González Grueso2007-06
    [西班牙語文學系暨研究所] 期刊論文
    Culturas Populares. Revista electrónica 4, (17 pages)
    Fernando Darío González Grueso Buddai y el gigante durmiente aborigen de Australia Lovecraft; The Shadow out of Time; Buddai; Myth; Legend; Giant

    777Stationary Queue Length Distribution for a Discrete-Time Preemptive Priority Queue

    Zhang, hong-bo; Zheng, qun-zhen2016
    [資訊與管理科學期刊] 第27卷第3期
    International Journal of Information and Management Sciences 27 (3), pp.237-251
    Zhang, hong-bo Zheng, qun-zhen Stationary Queue Length Distribution for a Discrete-Time Preemptive Priority Queue 淡江大學出版中心 Geo/Geo/1 queue

    778Evaluating the Lagged Effects of Direct Employee Equity Incentives on Organizational Innovation

    Mei-Ling Wang2016-01
    [企業管理學系暨研究所] 期刊論文
    Journal of Testing and Evaluation 44(1), p.206-212
    on organizational innovation. Based on a sample consisting of 366 publicly listed high-tech firms in Taiwan, we tested the lagged effects in pooled-time

    779Gain-margins and phase-margins of multivariable time-delay systems

    Tsung-Huang Ma; Chih-Min Lin; 2016-08-01
    [電機工程學系暨研究所] 期刊論文
    Journal of Marine Science and Technology 24(4), p.736-743
    Tsung-Huang Ma Chih-Min Lin Fei Chao Chun-Fei Hsu Jih-Gau Juang Ching-Hung Lee Gain-margins and phase-margins of multivariable time-delay systems 臺灣

    780On the synthesis of finite frequency internal-model-based H-infinity controllers for continuous-time linear systems

    Wei, Sheng-Fong; Chou, Yung-Shan2019-09-12
    [電機工程學系暨研究所] 會議論文
    Wei, Sheng-Fong Chou, Yung-Shan On the synthesis of finite frequency internal-model-based H-infinity controllers for continuous-time linear systems

    781Particle swarm optimization algorithm reinforced fuzzy proportional–integral–derivative for a quadrotor attitude control

    Chiou, Juing-Shian; Tran, Huu-Khoa; 2016-09-12
    [資訊管理學系暨研究所] 期刊論文
    Advances in Mechanical Engineering
    the elite parameters for the schemes of fuzzy proportional–integral–derivative controls. The integral of time multiplied by absolute error criterion

    782Pricing strategies in the Silicon Valley housing market: an update on TOM and recent events

    Cheng, Wan-Hsiu; Chiu, Shih-Chieh; 2024-09-20
    [財務金融學系暨研究所] 期刊論文
    International Journal of Housing Markets and Analysis
    events Time-on-market; Price difference; Nonlinear hedonic model; Silicon Valley; COVID-19; Fed This study aims to explore the relationship between

    783跨時空的憂鬱與相依:《時光的彼岸》中的日記書寫與脆弱性倫理

    吳凱書2025-01-09
    [英文學系暨研究所] 會議論文
    吳凱書 跨時空的憂鬱與相依:《時光的彼岸》中的日記書寫與脆弱性倫理 Melancholy and Interdependence Across Time and Space: Diary Writing and the Ethics of Vulnerability in A Tale

    784有限計畫期間下同時考慮延遲付款條件及貨幣時間價值的退化性商品存貨模式

    李培齊; 張紘炬2001
    [管理科學學系暨研究所] 研究報告
    淡江大學管理科學研究所 李培齊 張紘炬 有限計畫期間下同時考慮延遲付款條件及貨幣時間價值的退化性商品存貨模式 A Finite Time Horizon Inventory Model with Deterioration and Time-Value of Money under

    785DOCSIS performance analysis under high traffic conditions in the HFC networks

    李維聰; Lee, Wei-tsong; 2006-03
    [電機工程學系暨研究所] 期刊論文
    IEEE Transactions on Broadcasting 52(1), pp.21-30
    for the TBEB algorithm and then uses this model to identify the window size which yields the optimal system throughput and minimum delay time under high


    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library & TKU Library IR teams. Copyright ©   - 回饋