淡江大學機構典藏:搜寻结果
English  |  正體中文  |  简体中文  |  全文笔数/总笔数 : 64185/96959 (66%)
造访人次 : 12047070      在线人数 : 20897
RC Version 7.0 © Powered By DSPACE, MIT. Enhanced by NTU Library & TKU Library IR team.
搜寻范围 查询小技巧:
  • 您可在西文检索词汇前后加上"双引号",以获取较精准的检索结果
  • 若欲以作者姓名搜寻,建议至进阶搜寻限定作者字段,可获得较完整数据
  • 进阶搜寻

    类别浏览

    正在载入社群分类, 请稍候....

    作者浏览

    正在载入作者分类, 请稍候...

    年代浏览

    正在载入年代分类, 请稍候....

    结果 1871-1880 / 16823.

    上一页179 180 181 182 183 184 185 186 187 188 189 190 191 192 193 194 195 196 197 下一页    每页显示[10|25|50]项目
    [ 只搜寻有全文项目| 搜寻所有项目]     排序字段 順序

    1871Bioheat Transfer and Thermal Heating for Tumor Treatment

    Huang, Huang-Wen; Horng, Tzyy-Leng2015-01-22
    [資訊創新與科技學系] 專書之單篇
    Heat Transfer and Fluid Flow in Biological Processes, pp.1-43
    *Corresponding author: hhw402@mail.tku.edu.tw OUTLINE 1.1 Pennes' and Other Bioheat Transfer 1.3 Thermal Relaxation Time Factor in Equations

    1872An Extended Newsboy Problem with Shortage-level Constraints

    莊忠柱; Chen, M. S2000-12-01
    [管理科學學系暨研究所] 期刊論文
    International Journal of Production Economics67, pp.269-277
    quantity which is decided for a spot selling time in the classical newsboy problem. Both the purchase timing and the time-variant variance of the demand

    1873Anomalous dynamic scaling of interfaces in disordered media

    Pang, Ning-ning; Tzeng, Wen-jer1999-01
    [物理學系暨研究所] 期刊論文
    Physical Review E (Statistical Physics, Plasmas, Fluids, and Related Interdisciplinary Topics) 59(1), pp.234-238
    the dynamic correlations of the interface roughening process by studying the qth order equal-time height difference correlation functions. We find

    1874Inventory lot-size policies for deteriorating items with expiration dates and advance payments

    Teng, Jinn-Tsair; Leopoldo, Eduardo Cárdenas-Barrón; 2016-10
    [管理科學學系暨研究所] 期刊論文
    Applied Mathematical Modelling 40(19–20), pp.8605-8616
    , the optimal cycle time and the cycle fraction of no shortages are the decision variables that minimize the total cost. The total annual relevant cost

    1875Optimal pricing, shipment and payment policy for an integrated supplier-buyer inventory model with two-part trade credit

    Ho, Chia-huei; 歐陽良裕; 2008-06
    [管理科學學系暨研究所] 期刊論文
    European Journal of Operational Research 187(2), pp.496-510
    profit per unit time. An iterative algorithm is established to obtain the optimal strategy. Furthermore, numerical examples and sensitivity analysis

    1876Optimal replenishment decisions under two-level trade credit with partial upstream trade credit linked to order quantity and limited storage capacity

    Yang, Chih-Te; Ouyang, Liang-Yuh; 2014-02-01
    [管理科學學系暨研究所] 期刊論文
    Mathematical Problems in Engineering 2014, 736712(14pages)
    (2010), Ouyang et al. (2013), and Teng et al. (2007) to reflect the real-life situations by incorporating the following concepts: (1) the storage capacity

    1877Piconet Construction and Restructuring Mechanisms for Interference Avoiding in Bluetooth PANs

    Qiaoyun Zhang; Guilin Chen; 2016-11-01
    [資訊工程學系暨研究所] 期刊論文
    Journal of Network and Computer Applications vol.75, pp.89-100
    in ISM band, Bluetooth adopts a time-slotted frequency-hopping spread-spectrum scheme, preventing the Bluetooth device communication from being

    1878Electrochemical Cr(VI) reduction using a sacrificial Fe anode: Impacts of solution chemistry and stoichiometry

    Sheng-Ming Chuang; Ya Vinh; 2018-01-31
    [水資源及環境工程學系暨研究所] 期刊論文
    Separation and Purification Technology 191, p.167-172
    of Fe(II). The Cr(VI) reduction rate increased with decreasing pH at the initial stage of reaction but the time to reach complete Cr(VI) reduction is pH

    1879Building ANN-based regional multi-step-ahead flood inundation forecast models

    Li-Chiu Chang; Mohd Zaki M. Amin; 2018-09-19
    [水資源及環境工程學系暨研究所] 期刊論文
    Water2018 10(9), 1283
    A regional inundation early warning system is crucial to alleviating flood risks and reducing loss of life and property. This study aims to provide real-time

    1880Bi-criteria single machine scheduling problem with a learning effect: Aneja–Nair method to obtain the set of optimal sequences

    Mani, V.; Chang, P. C.; 2009-07
    [資訊工程學系暨研究所] 期刊論文
    Computers and mathematics with applications 58(1), p.39-47.
    machine scheduling problem of n jobs with a learning effect. The two objectives considered are the total completion time (TC) and total absolute


    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library & TKU Library IR teams. Copyright ©   - 回馈