淡江大學機構典藏:Item 987654321/92111
English  |  正體中文  |  简体中文  |  Items with full text/Total items : 62805/95882 (66%)
Visitors : 3947275      Online Users : 589
RC Version 7.0 © Powered By DSPACE, MIT. Enhanced by NTU Library & TKU Library IR team.
Scope Tips:
  • please add "double quotation mark" for query phrases to get precise results
  • please goto advance search for comprehansive author search
  • Adv. Search
    HomeLoginUploadHelpAboutAdminister Goto mobile version
    Please use this identifier to cite or link to this item: https://tkuir.lib.tku.edu.tw/dspace/handle/987654321/92111


    Title: 資訊系統委外風險之研究-以A銀行為例
    Authors: 黃龍琤;黃明達
    Contributors: 淡江大學資訊管理學系
    Keywords: 資訊系統委外;委外生命週期;委外風險;Information system outsourcing;Outsourcing life cycle;Outsourcing risk
    Date: 2013-07-13
    Issue Date: 2013-09-02 10:34:35 (UTC+8)
    Publisher: 臺北市:中華民國電腦稽核協會
    Abstract: 資訊系統委外盛行的當今,如何讓委外專案成功的執行顯得格外重要。本研究希望透過個案研究的方式,瞭解資訊系統委外所可能發生的風險,進而預防風險以利提升資訊系統委外專案的成功率。本研究首先透過文獻探討,並綜合實務經驗,產出一個以資訊系統委外生命週期為基礎的風險研究架構,並以國內某外商A銀行企業金融資訊處做為研究對象,搜集三年內的23個資訊系統委外合約的相關資料,進行風險的回顧分析,探討各委外階段所可能發生的風險,最後提出個案分析的主要發現以及相關建議作為研究結論。研究結果顯示,委外生命週期中最常發生風險的階段為「合約中階段」,最容易發生風險的主要管理活動為「6.委外專案執行」。主要常見的風險項目為「C7.1缺乏評價測量標準和工具」、「B4.2合約未指定不履約處罰」、「B4.1合約未指定適當的量表」、「B6.5變更和逐漸產生的目標/範圍/需求」、「A2.1不適當的預估時程表及所需資源」、「B4.10供應商鎖定(Lock-in)」及「B6.1過度依賴供應商」。
    Information system outsourcing is very popular nowadays, therefore to be successful when outsourcing a project is particularly important. The purpose of this case study is to understand the risk of information system outsourcing, and thus preventing the risks and improve the success rate of information system outsourcing projects. From literature reviews and practical experiences, this paper developed a conceptual framework of information system outsourcing risks based on an outsourcing life cycle. 23 samples of outsourcing contracts and within the period of 3 years and its related information were extracted from the Bank A for this case study. This paper reviews the risks from the selected 23 outsourcing projects and discusses the possible risks for each phases of the outsourcing life cycle. The major findings and implication of the case study are also discussed in this paper. The result shows that the most risky phase of the outsourcing life cycle is “Contract phase”. The most risky managerial activity is“ 6. Outsourcing project execution”. The most common risk items are “C 7. 1 Lake of assess measurement, metrics, and tools”, “B 4. 2 Failure to specify non-performance penalties”, “B 4. 1 Failure to specify appropriate measures”, “B 6. 5 Changing & creeping objectives/ scope/requirements”, “A 2. 1 Unrealistic estimation of schedule & required resources”, “B 4. 10 Vendor lock-in”, “B 6. 1 Over dependence on the vendor”.
    Relation: 電腦稽核 28,頁61-71
    Appears in Collections:[Graduate Institute & Department of Information Management] Journal Article

    Files in This Item:

    File Description SizeFormat
    index.html0KbHTML216View/Open
    index.html0KbHTML34View/Open
    資訊系統委外風險之研究-以A銀行為例.pdf1301KbAdobe PDF0View/Open

    All items in 機構典藏 are protected by copyright, with all rights reserved.


    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library & TKU Library IR teams. Copyright ©   - Feedback