淡江大學機構典藏:Item 987654321/80365
English  |  正體中文  |  简体中文  |  全文笔数/总笔数 : 62805/95882 (66%)
造访人次 : 3944838      在线人数 : 608
RC Version 7.0 © Powered By DSPACE, MIT. Enhanced by NTU Library & TKU Library IR team.
搜寻范围 查询小技巧:
  • 您可在西文检索词汇前后加上"双引号",以获取较精准的检索结果
  • 若欲以作者姓名搜寻,建议至进阶搜寻限定作者字段,可获得较完整数据
  • 进阶搜寻


    jsp.display-item.identifier=請使用永久網址來引用或連結此文件: https://tkuir.lib.tku.edu.tw/dspace/handle/987654321/80365


    题名: Mathematical Programming Model for Type-I Two-sided Assembly Line Balancing Problem
    作者: Yeh, Din-Horng;Huang, Sih-Ting
    贡献者: 淡江大學企業管理學系
    关键词: Type-I assembly line balancing;Two-sided;Mathematical programming
    日期: 2012-12
    上传时间: 2013-01-23 11:28:55 (UTC+8)
    摘要: Two-sided assembly line balancing problem (TALBP) is commonly seen in the industries of assembling large-size products; typical examples include automobiles, buses, trucks, etc. Unlike the traditional assembly lines, assembly tasks in TALBP must be processed on both sides of the assembly line. Only limited researches discuss the issues of TALBP. We consider in this study the so-called type-I TALBP (TALBP-I), and the objective of this study is to propose a mathematical programming model to find the optimal task assignment of TALBP-I. An illustrative example is given to show the effectiveness of the model. We also show that, through numerical experiments, the model can be extended to solve type-II TALBP (TALBP-II).
    Two-sided assembly line balancing problem (TALBP) is commonly seen in the industries of assembling large-size products; typical examples include automobiles, buses, trucks, etc. Unlike the traditional assembly lines, assembly tasks in TALBP must be processed on both sides of the assembly line. Only limited researches discuss the issues of TALBP. We consider in this study the so-called type-I TALBP (TALBP-I), and the objective of this study is to propose a mathematical programming model to find the optimal task assignment of TALBP-I. An illustrative example is given to show the effectiveness of the model. We also show that, through numerical experiments, the model can be extended to solve type-II TALBP (TALBP-II).
    關聯: The IEEE International Conference on Industrial Engineering and Engineering Management
    显示于类别:[企業管理學系暨研究所] 會議論文

    文件中的档案:

    没有与此文件相关的档案.

    在機構典藏中所有的数据项都受到原著作权保护.

    TAIR相关文章

    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library & TKU Library IR teams. Copyright ©   - 回馈