淡江大學機構典藏:
English  |  正體中文  |  简体中文  |  Items with full text/Total items : 64178/96951 (66%)
Visitors : 10574471      Online Users : 6799
RC Version 7.0 © Powered By DSPACE, MIT. Enhanced by NTU Library & TKU Library IR team.
Scope Tips:
  • please add "double quotation mark" for query phrases to get precise results
  • please goto advance search for comprehansive author search
  • Adv. Search

    社群统计


    Item counts issued in 3 years: 638(2.48%)
    Items With Fulltext: 18299(71.07%)

    Download counts of the item
    Download times greater than 0: 18299(100.00%)
    Download times greater than 10: 18299(100.00%)
    Total Bitstream Download Counts: 6113612(26.68%)

    Last Update: 2025-06-02 00:11

    上传排行

    数据加载中.....

    下载排行

    数据加载中.....

    RSS Feed RSS Feed

    跳至: [中文]   [数字0-9]   [ A B C D E F G H I J K L M N O P Q R S T U V W X Y Z ]
    请输入前几个字:   

    显示项目5601-5625 / 25746. (共1030页)
    << < 220 221 222 223 224 225 226 227 228 229 > >>
    每页显示[10|25|50]项目

    日期题名作者
    2004-12 Optimal pricing and replenishment policy for non-instantaneous deteriorating item with price sensitive demand 吳坤山; Wu1, Kun-Shan
    2021-11-11 Optimal Pricing, Advertising, Production, Inventory and Investing Policies in a Multi-Stage Sustainable Supply Chain Jia-Liang Pan; Chui-Yu Chiu;
    2008-06 Optimal pricing, shipment and payment policy for an integrated supplier-buyer inventory model with two-part trade credit Ho, Chia-huei; 歐陽良裕;
    2004-03 Optimal process mean setting of quality targeting model for three machines in series 李旭華
    2013-08-01 Optimal production lot with imperfect production process under permissible delay in payments and complete backlogging Ouyang, L.-Y.; Chang, C.-T.;
    2009 Optimal production-shipment decisions for the finite production rate model with scrap Chiu, Singa Wang; Lin, Hong-Dar;
    2013-11-01 Optimal progressive group censoring scheme under cost considerations for pareto distribution Kuş, Coşkun; Akdoğan, Yunus;
    2012-07 Optimal progressive group censoring scheme under cost considerations for Pareto distribution Kuş, C.; Akdoğan, Y.;
    2006-07 Optimal progressive group-censoring plan 吳碩傑; 吳碩傑
    2015-01-01 Optimal Progressive Group-Censoring Plans for Chen Distribution under Cost Constraint Yunus Akdoğan; Coşkun KUŞ;
    2010-06 Optimal progressive group-censoring plans for exponential distribution in presence of cost constraint Wu, Shuo-Jye; Huang, Syuan-Rong;
    2011-06 Optimal Progressive Group-Censoring Plans for Logistic Distribution Under Cost Constraint Akdogan, Yunus; Kus, Coskun;
    2019-08-25 Optimal progressive interval censoring plan under accelerated life test with limited budget Wu Shuo-Jye; Huang Syuan-Rong
    1984-01 The Optimal Real and Reactive Power Dispatch -上- 楊維楨
    1984-02 The Optimal Real and Reactive Power Dispatch -下- 楊維楨
    2024-12-04 Optimal recovery aircraft assignment model for aircraft grounding of a certain aircraft type Chen, Chun-ying; Chen, Yu-hsin
    2014-02-01 Optimal replenishment decisions under two-level trade credit with partial upstream trade credit linked to order quantity and limited storage capacity Yang, Chih-Te; Ouyang, Liang-Yuh;
    2010-01 Optimal replenishment policies for non-instantaneous deteriorating items with stock-dependent demand Chang, Chun-Tao; Teng, Jinn-Tsair;
    2024-10-09 Optimal Replenishment Strategy for a High-Tech Product Demand with Non-Instantaneous Deterioration under an Advance-Cash-Credit Payment Scheme by a Discounted Cash-Flow Analysis Yang, Hui-Ling; Chang, Chun-Tao;
    2024-10-09 Optimal Replenishment Strategy for a High-Tech Product Demand with Non-Instantaneous Deterioration under an Advance-Cash-Credit Payment Scheme by a Discounted Cash-Flow Analysis Chang, Chun-tao; Tseng, Yao-ting
    1999-07-01 Optimal reward scheme for heterogeneous salesforce 陳淼勝; Chen, Miao-sheng;
    2017-01 Optimal sample size allocation for accelerated life test under progressive type-II censoring with competing risks Huang, Syuan-Rong; Wu, Shuo-Jye
    Optimal Scheduling of Logistical Support for an Emergency Roadway Repair Work Schedule Lin, Chih-kang
    2009-11-05 Optimal Scheduling of Logistical Support given Emergency Roadway Repair Work Schedule 顏上堯; 林至康;
    1991 Optimal selling quantity and purchasing price for intermediary firms 陳正綱; Chen, Cheng-kang;

    显示项目5601-5625 / 25746. (共1030页)
    << < 220 221 222 223 224 225 226 227 228 229 > >>
    每页显示[10|25|50]项目

    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library & TKU Library IR teams. Copyright ©   - 回馈