English  |  正體中文  |  简体中文  |  Items with full text/Total items : 64191/96979 (66%)
Visitors : 8572843      Online Users : 8413
RC Version 7.0 © Powered By DSPACE, MIT. Enhanced by NTU Library & TKU Library IR team.
Scope Tips:
  • please add "double quotation mark" for query phrases to get precise results
  • please goto advance search for comprehansive author search
  • Adv. Search
    HomeLoginUploadHelpAboutAdminister Goto mobile version

    Siblings


    文學院 [5352/7884]
    理學院 [6450/8691]
    工學院 [16879/26445]
    外國語文學院 [4123/7256]
    國際事務學院 [5860/9316]
    教育學院 [4757/7986]
    創業發展學院 [156/233]
    精準健康學院 [45/53]
    全球化研究與發展學院 [173/227]
    社區發展學院 [1/1]
    全球發展學院 [539/764]
    技術學院 [223/322]
    行政單位 [367/493]
    體育事務處 [771/1404]
    淡江出版期刊 [237/237]
    66週年校慶研討會 [65/65]
    67週年校慶研討會 [9/9]
    教育部教學實踐研究計畫 [72/72]

    Community Statistics


    近3年內發表的文件: 638(2.48%)
    含全文筆數: 18299(71.07%)

    文件下載次數統計
    下載大於0次: 18299(100.00%)
    下載大於10次: 18299(100.00%)
    檔案下載總次數: 6062257(26.67%)

    最後更新時間: 2025-05-26 08:39

    Top Upload

    Loading...

    Top Download

    Loading...

    RSS Feed RSS Feed

    Jump to: [Chinese Items]   [0-9]   [ A B C D E F G H I J K L M N O P Q R S T U V W X Y Z ]
    or enter the first few letters:   

    Showing items 5001-5010 of 25746. (2575 Page(s) Totally)
    << < 96 97 98 99 100 101 102 103 104 105 > >>
    View [10|25|50] records per page

    DateTitleAuthors
    1999-07 Mixture Inventory model involving variable lead time and defective units Ouyang, Liang-yuh; Wu, Kun-shan
    1998-03 MIXTURE INVENTORY MODEL INVOLVING VARIABLE LEAD TIME WITH A SERVICE LEVEL CONSTRAINT Ouyang, Liang-Yuh; Wu, Kun-Shan
    1997-09-01 Mixture inventory model involving variable lead time with a service level constraint Ouyang, Liang-yuh; 吳坤山;
    2001-02-01 Mixture inventory model with back orders and lost sales for variable lead time demand with the mixtures of normal distribution Wu, Jong-wuu; Tsai, Hui-yin
    1996-06-01 Mixture Inventory Model with Backorders and Lost Sales for Variable Lead Time 歐陽良裕; Ouyang, Liang-yuh;
    2004-09-01 MLE and the Estimated Expected Test Time for Pareto Distribution under Progressive Censoring Data Wu, Chin-chuan; Wu, Shu-fei;
    2006-10-01 MLE and the estimated expected test time for the two-parameter Gompertz distribution under progressive censoring with binomial removals 吳錦全; Wu, Chin-chuan;
    2013-07-05 MNC's Greening Human Capital Management in China—integrative perspective of Resource-Based and Institutional Theory Jaw, B. S.; Wang, C. Y. P.;
    2014-01 MNCs' Greening Human Capital Management in China- Integrative perspective of Resource-Based and Institutional Theory Lee, Meng-Hsiu
    2014-08-09 MNC’s Green Entrepreneurial Leadership and Greening Human Capital Management in China Lee, M. H.; Jaw, B. S.

    Showing items 5001-5010 of 25746. (2575 Page(s) Totally)
    << < 96 97 98 99 100 101 102 103 104 105 > >>
    View [10|25|50] records per page

    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library & TKU Library IR teams. Copyright ©   - Feedback