淡江大學機構典藏:Item 987654321/76806
English  |  正體中文  |  简体中文  |  全文笔数/总笔数 : 62819/95882 (66%)
造访人次 : 4001984      在线人数 : 672
RC Version 7.0 © Powered By DSPACE, MIT. Enhanced by NTU Library & TKU Library IR team.
搜寻范围 查询小技巧:
  • 您可在西文检索词汇前后加上"双引号",以获取较精准的检索结果
  • 若欲以作者姓名搜寻,建议至进阶搜寻限定作者字段,可获得较完整数据
  • 进阶搜寻


    jsp.display-item.identifier=請使用永久網址來引用或連結此文件: https://tkuir.lib.tku.edu.tw/dspace/handle/987654321/76806


    题名: Bi-Level Model to Solve Scheduling Problem of Make-to-Order Production
    作者: Lan, Chun-Hsiung;Chen, Hai-Ming;Chen, Mei-Hsiu;Chiu, Chih-Wei
    贡献者: 淡江大學管理科學學系
    关键词: Production Scheduling;Lingo 9.0;Make-to-Order Production;Visual Basic 6.0;Production Layout-PL
    日期: 2012-03
    上传时间: 2012-05-18 17:49:30 (UTC+8)
    出版者: Gyeongju-si: Advanced Institute of Convergence I T
    摘要: This study aims to construct a production scheduling system by using two models, one is constructed through the syntax of Lingo 9.0 and the other is developed by Visual Basic software, to conduct the search approach of the optimal solution for the scheduling problem of make-to-order production. The major contributions of this paper are as follows: Firstly, the production quantity, the shortage quantity, and the holding period before the delivery time of each product in any order are found in this work. Secondly, the production system layout for producing a given product is determined by the solution found in the first model. The hybrid investigation of scheduling problem and production layout is the last contribution. The main frame of this study for considering the manufacturing cost, resource cost, holding cost, and tardiness cost is developed in the first model and the optimal solution is achieved by the built-in “global solver” method of the Lingo software. The solving approach of the layout of production system adopts the model and its solving program [4] to conduct the production system deployment. In summary, the proposed work provides a highly repeated characteristic because of the application of the packaged software. Based on the above-mentioned characteristic, this paper can solve other scheduling problems easily as well as the determination of production layout by changing the associated input parameters only.
    關聯: Advances in Information Sciences and Service Sciences 4(4), pp.85-94
    DOI: 10.4156/AISS.vol4.issue4.11
    显示于类别:[管理科學學系暨研究所] 期刊論文

    文件中的档案:

    档案 描述 大小格式浏览次数
    index.html0KbHTML276检视/开启

    在機構典藏中所有的数据项都受到原著作权保护.

    TAIR相关文章

    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library & TKU Library IR teams. Copyright ©   - 回馈