淡江大學機構典藏:Item 987654321/76806
English  |  正體中文  |  简体中文  |  Items with full text/Total items : 62830/95882 (66%)
Visitors : 4042044      Online Users : 997
RC Version 7.0 © Powered By DSPACE, MIT. Enhanced by NTU Library & TKU Library IR team.
Scope Tips:
  • please add "double quotation mark" for query phrases to get precise results
  • please goto advance search for comprehansive author search
  • Adv. Search
    HomeLoginUploadHelpAboutAdminister Goto mobile version
    Please use this identifier to cite or link to this item: https://tkuir.lib.tku.edu.tw/dspace/handle/987654321/76806


    Title: Bi-Level Model to Solve Scheduling Problem of Make-to-Order Production
    Authors: Lan, Chun-Hsiung;Chen, Hai-Ming;Chen, Mei-Hsiu;Chiu, Chih-Wei
    Contributors: 淡江大學管理科學學系
    Keywords: Production Scheduling;Lingo 9.0;Make-to-Order Production;Visual Basic 6.0;Production Layout-PL
    Date: 2012-03
    Issue Date: 2012-05-18 17:49:30 (UTC+8)
    Publisher: Gyeongju-si: Advanced Institute of Convergence I T
    Abstract: This study aims to construct a production scheduling system by using two models, one is constructed through the syntax of Lingo 9.0 and the other is developed by Visual Basic software, to conduct the search approach of the optimal solution for the scheduling problem of make-to-order production. The major contributions of this paper are as follows: Firstly, the production quantity, the shortage quantity, and the holding period before the delivery time of each product in any order are found in this work. Secondly, the production system layout for producing a given product is determined by the solution found in the first model. The hybrid investigation of scheduling problem and production layout is the last contribution. The main frame of this study for considering the manufacturing cost, resource cost, holding cost, and tardiness cost is developed in the first model and the optimal solution is achieved by the built-in “global solver” method of the Lingo software. The solving approach of the layout of production system adopts the model and its solving program [4] to conduct the production system deployment. In summary, the proposed work provides a highly repeated characteristic because of the application of the packaged software. Based on the above-mentioned characteristic, this paper can solve other scheduling problems easily as well as the determination of production layout by changing the associated input parameters only.
    Relation: Advances in Information Sciences and Service Sciences 4(4), pp.85-94
    DOI: 10.4156/AISS.vol4.issue4.11
    Appears in Collections:[Department of Management Sciences] Journal Article

    Files in This Item:

    File Description SizeFormat
    index.html0KbHTML277View/Open

    All items in 機構典藏 are protected by copyright, with all rights reserved.


    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library & TKU Library IR teams. Copyright ©   - Feedback