淡江大學機構典藏:Item 987654321/75430
English  |  正體中文  |  简体中文  |  Items with full text/Total items : 62830/95882 (66%)
Visitors : 4043779      Online Users : 968
RC Version 7.0 © Powered By DSPACE, MIT. Enhanced by NTU Library & TKU Library IR team.
Scope Tips:
  • please add "double quotation mark" for query phrases to get precise results
  • please goto advance search for comprehansive author search
  • Adv. Search
    HomeLoginUploadHelpAboutAdminister Goto mobile version
    Please use this identifier to cite or link to this item: https://tkuir.lib.tku.edu.tw/dspace/handle/987654321/75430


    Title: Managing the full ERP life-cycle: Considerations of maintenance and support requirements and IT governance practice as integral elements of the formula for successful ERP adoption
    Authors: Law, Chuck C. H.;Chen, Charlie C.;Wu, Bruce J. P.
    Contributors: 淡江大學資訊管理學系
    Keywords: Enterprise resource planning;Customization;Maintenance and support;Software patches
    Date: 2010-04
    Issue Date: 2012-03-25 11:32:43 (UTC+8)
    Publisher: Elsevier
    Abstract: Companies adopting enterprise resource planning (ERP) systems have often focused primarily on implementation-related factors while neglecting those of post-implementation. As a result, the usefulness and operation of the ERP systems, once installed, are compromised. This research adopted a case study approach to demonstrate that ERP adoption efforts that fail to pay attention to post-implementation requirements (especially those relevant to maintenance and support (M&S)) from an early stage in the project lifecycle will face dire consequences. It points out that poor planning and management of M&S services can imperil the normal operations of an ERP system and the daily activities of a business. With the life span of ERP systems getting shorter, sound M&S practices can extend their life and create a stable system platform to support efficient and effective business operations. M&S issues deserve to be considered as integral elements among the critical success factors (CSF) of ERP adoption projects. In other words, ERP success requires a full lifecycle perspective to be taken by adopting companies. With lessons having been learned from the mistakes in the first project, the company in this case study revamped its ERP implementation second time out, with due consideration being given to M&S strategies and practices from project initiation onward in order to realize a stable, usable, and maintainable system. The case study explores and identifies the critical success factors (CSF) of ERP adoption, and shows that M&S must be included as a key element from the outset and throughout the system lifecycle. Our findings capture a great deal of experience for any ERP adopting companies to follow in order to avoid learning costly lessons both in implementation and subsequent M&S throughout the lifespan of the system. A set of propositions is also presented for academic researcher to consider in future ERP research endeavors.
    Relation: Computers in Industry 61(3), pp.297-308
    DOI: 10.1016/j.compind.2009.10.004
    Appears in Collections:[Graduate Institute & Department of Information Management] Journal Article

    Files in This Item:

    File Description SizeFormat
    Managing the full ERP life-cycle.pdf320KbAdobe PDF432View/Open

    All items in 機構典藏 are protected by copyright, with all rights reserved.


    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library & TKU Library IR teams. Copyright ©   - Feedback