淡江大學機構典藏:Item 987654321/58508
English  |  正體中文  |  简体中文  |  Items with full text/Total items : 62805/95882 (66%)
Visitors : 3932726      Online Users : 474
RC Version 7.0 © Powered By DSPACE, MIT. Enhanced by NTU Library & TKU Library IR team.
Scope Tips:
  • please add "double quotation mark" for query phrases to get precise results
  • please goto advance search for comprehansive author search
  • Adv. Search
    HomeLoginUploadHelpAboutAdminister Goto mobile version
    Please use this identifier to cite or link to this item: https://tkuir.lib.tku.edu.tw/dspace/handle/987654321/58508


    Title: Optimal production-shipment decisions for the finite production rate model with scrap
    Authors: Chiu, Singa Wang;Lin, Hong-Dar;Cheng, Chi-Bin;Chung, Chia-Ling
    Contributors: 淡江大學資訊管理學系
    Keywords: manufacturing;multiple shipments;FPR model;scrap;optimal batch size;inventory
    Date: 2009
    Issue Date: 2011-10-01 12:05:58 (UTC+8)
    Publisher: Split: Sveuciliste u Splitu * Gradevinski Fakultet
    Abstract: This paper is concerned with the decision-making on the optimal production batch size and optimal number of shipments for a finite production rate model with random scrap rate. The classic finite production rate (FPR) model assumes a continuous inventory issuing policy for satisfying product demand and perfect quality for all items produced. However, in a real life vendor-buyer integrated production-inventory system, a multiple shipment policy is practically used in lieu of the continuous issuing policy, and it is inevitable to generate defective items during a production run. All nonconforming items produced are assumed to be scrap, and the finished (perfect quality) products can only be delivered to customers if the whole lot is quality assured at the end of the production run. The fixed-quantity multiple instalments of the finished batch are delivered to customers at a fixed interval of time. Mathematical modelling is employed and the renewal reward theorem is used to cope with the variable production cycle length. The long-run average cost for the proposed model is derived, and its convexity is proved by the use of the Hessian matrix equations. A closed-form optimal production-shipment policy for such an imperfect FPR model is obtained and a special case is discussed. Finally, a numerical example is provided to demonstrate the model’s practical usage.
    Relation: International Journal for Engineering Modelling 22(1-4), pp.25-34
    Appears in Collections:[Graduate Institute & Department of Information Management] Journal Article

    Files in This Item:

    File Description SizeFormat
    1330-1365_22(1-4)p25-34.pdf309KbAdobe PDF3View/Open
    index.html0KbHTML63View/Open

    All items in 機構典藏 are protected by copyright, with all rights reserved.


    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library & TKU Library IR teams. Copyright ©   - Feedback