淡江大學機構典藏:Item 987654321/55887
English  |  正體中文  |  简体中文  |  全文筆數/總筆數 : 62805/95882 (66%)
造訪人次 : 3923917      線上人數 : 578
RC Version 7.0 © Powered By DSPACE, MIT. Enhanced by NTU Library & TKU Library IR team.
搜尋範圍 查詢小技巧:
  • 您可在西文檢索詞彙前後加上"雙引號",以獲取較精準的檢索結果
  • 若欲以作者姓名搜尋,建議至進階搜尋限定作者欄位,可獲得較完整資料
  • 進階搜尋
    請使用永久網址來引用或連結此文件: https://tkuir.lib.tku.edu.tw/dspace/handle/987654321/55887


    題名: Project performance vs. Use of technologies at the project- and phase-levels
    作者: 楊立人;Yang, Li-ren;James T. O'Connor
    貢獻者: 淡江大學企業管理學系
    日期: 2004-05-01
    上傳時間: 2011-09-02 09:56:05 (UTC+8)
    出版者: Vilnius Gediminas Technical University
    摘要: Lack of information regarding technology benefits along with uncertain competitive advantage from new technology have resulted in industry reluctance to implement new technologies. An industry-wide survey was used to collect project data from more than 200 capital facility projects on the issue of technology usage and overall project success. Twenty-two research hypotheses are presented and analyzed according to five different data class variables: industry sector, total installed cost, public versus private, greenfield versus expansion versus renovation, and typical versus advanced projects. Findings pertaining to associations between project success and technology usage at the project and phase level are discussed. The results of this research indicate that several technologies may contribute significantly to project performance in terms of cost and schedule success, particularly for certain types of projects. In addition, project schedule success is more closely associated with technology utilization than is project cost success. Findings from this study can provide companies with information on technology benefits and whether to use certain technologies.
    關聯: Journal of Construction Engineering and Management 130(3), pp.322-329
    DOI: 10.1061/(ASCE)0733-9364(2004)130:3(322)#sthash.aiiI3Env.dpuf
    顯示於類別:[企業管理學系暨研究所] 期刊論文

    文件中的檔案:

    檔案 描述 大小格式瀏覽次數
    index.html0KbHTML81檢視/開啟
    Project performance vs. Use of technologies at the project- and phase-levels.pdf294KbAdobe PDF2檢視/開啟

    在機構典藏中所有的資料項目都受到原著作權保護.

    TAIR相關文章

    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library & TKU Library IR teams. Copyright ©   - 回饋