淡江大學機構典藏:Item 987654321/55887
English  |  正體中文  |  简体中文  |  全文笔数/总笔数 : 64191/96979 (66%)
造访人次 : 8061305      在线人数 : 10356
RC Version 7.0 © Powered By DSPACE, MIT. Enhanced by NTU Library & TKU Library IR team.
搜寻范围 查询小技巧:
  • 您可在西文检索词汇前后加上"双引号",以获取较精准的检索结果
  • 若欲以作者姓名搜寻,建议至进阶搜寻限定作者字段,可获得较完整数据
  • 进阶搜寻


    jsp.display-item.identifier=請使用永久網址來引用或連結此文件: https://tkuir.lib.tku.edu.tw/dspace/handle/987654321/55887


    题名: Project performance vs. Use of technologies at the project- and phase-levels
    作者: 楊立人;Yang, Li-ren;James T. O'Connor
    贡献者: 淡江大學企業管理學系
    日期: 2004-05-01
    上传时间: 2011-09-02 09:56:05 (UTC+8)
    出版者: Vilnius Gediminas Technical University
    摘要: Lack of information regarding technology benefits along with uncertain competitive advantage from new technology have resulted in industry reluctance to implement new technologies. An industry-wide survey was used to collect project data from more than 200 capital facility projects on the issue of technology usage and overall project success. Twenty-two research hypotheses are presented and analyzed according to five different data class variables: industry sector, total installed cost, public versus private, greenfield versus expansion versus renovation, and typical versus advanced projects. Findings pertaining to associations between project success and technology usage at the project and phase level are discussed. The results of this research indicate that several technologies may contribute significantly to project performance in terms of cost and schedule success, particularly for certain types of projects. In addition, project schedule success is more closely associated with technology utilization than is project cost success. Findings from this study can provide companies with information on technology benefits and whether to use certain technologies.
    關聯: Journal of Construction Engineering and Management 130(3), pp.322-329
    DOI: 10.1061/(ASCE)0733-9364(2004)130:3(322)#sthash.aiiI3Env.dpuf
    显示于类别:[企業管理學系暨研究所] 期刊論文

    文件中的档案:

    档案 描述 大小格式浏览次数
    index.html0KbHTML129检视/开启
    Project performance vs. Use of technologies at the project- and phase-levels.pdf294KbAdobe PDF3检视/开启

    在機構典藏中所有的数据项都受到原著作权保护.

    TAIR相关文章

    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library & TKU Library IR teams. Copyright ©   - 回馈