English  |  正體中文  |  简体中文  |  Items with full text/Total items : 62805/95882 (66%)
Visitors : 3925504      Online Users : 807
RC Version 7.0 © Powered By DSPACE, MIT. Enhanced by NTU Library & TKU Library IR team.
Scope Tips:
  • please add "double quotation mark" for query phrases to get precise results
  • please goto advance search for comprehansive author search
  • Adv. Search
    HomeLoginUploadHelpAboutAdminister Goto mobile version
    Please use this identifier to cite or link to this item: https://tkuir.lib.tku.edu.tw/dspace/handle/987654321/47030


    Title: 以類神經網路建置建築工程專案時程估算系統之研究
    Other Titles: Establishing Duration Estimating System of Architecture Construction Projects with Neural Network
    Authors: 范素玲
    Contributors: 淡江大學土木工程學系
    Date: 2009
    Issue Date: 2010-04-15 16:03:05 (UTC+8)
    Abstract: 如期、如質、如度完成工程專案,為工程專案管理之三個重要領域,然而 儘管學理上發展出許多工期排程模式如甘特圖、平衡線圖、網狀圖或模擬,然而 工期估算不如成本,有一快速簡單又準確量化之評估方法,亦不如品質有明確之 規範或標準可資遵循,因此本研究透過擬透過案例收集探討與專家訪談、問卷調 查輔以AHP以及德爾菲法,以建築工程之施工階段為研究範圍,探討不同建築工 程類型之WBS(工作分工結構圖),進而探討其影響工期之因素,透過類神經網路 與物件導向技術建構工期推估模式,並輔以關鍵鏈及模擬方法比較驗證其結果, 以期提供主辦機關較準確且快速地進行工期推算,亦可提供廠商投標之際,匆促 時間壓力下快速估算工期,俾使提供設計單位與廠商或主辦機關能夠快速且準確 地作工期推估,並可作為合約工期訂定與工期展延計算之參考。 To get projects done on time, within budget and at a certain quality level has been the main concerns of a construction project. However unlike budget and quality, there is neither a systematic way to estimate duration of a project nor standard specifications to be followed. Therefore this research is aimed at establishing a duration estimating model by analyzing the WBS and identifying the duration of different categories of architecture construction projects with application of expert interviews, questionnaires, AHP, DELPHI. Summarizing the duration influencing factors, it then applies neural network technique and object-oriented techniques with practical cases to implement the model, and verify the results with Simulation techniques and Critical Chain Techniques. With the proposed model, the following contribution will be achieved. 1. The WBS templates of different categories of architecture projects will be established. 2. A duration estimation model will be established which enables the owner or contractors to estimate the duration of project within a very short time-frame. 3. The output of the proposed model could be useful information for delay analysis
    Appears in Collections:[土木工程學系暨研究所] 研究報告

    Files in This Item:

    There are no files associated with this item.

    All items in 機構典藏 are protected by copyright, with all rights reserved.


    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library & TKU Library IR teams. Copyright ©   - Feedback