English  |  正體中文  |  简体中文  |  Items with full text/Total items : 65231/98744 (66%)
Visitors : 31967564      Online Users : 3129
RC Version 7.0 © Powered By DSPACE, MIT. Enhanced by NTU Library & TKU Library IR team.
Scope Tips:
  • please add "double quotation mark" for query phrases to get precise results
  • please goto advance search for comprehansive author search
  • Adv. Search
    HomeLoginUploadHelpAboutAdminister Goto mobile version
    Please use this identifier to cite or link to this item: https://tkuir.lib.tku.edu.tw/dspace/handle/987654321/35935


    Title: 大漢溪上游段攔河堰水工模型試驗
    Other Titles: Model study of proposed Dashi Weir and Wulin Weir in Dahanshi river
    Authors: 游貽任;Yu, Yi-jen
    Contributors: 淡江大學水資源及環境工程學系碩士班
    許中杰;Hsu, Chung-chieh
    Keywords: 大漢溪;攔河堰;水工模型試驗;Tahanshi River;Weir;Hydraulic Model
    Date: 2008
    Issue Date: 2010-01-11 07:22:09 (UTC+8)
    Abstract: 本研究應用水工模型試探討大漢溪上游段於大溪橋與武嶺橋段築堰前、後之水理變化及尾水流況,並建議適當之堰址與堰頂高程。試驗成果將與一維性水理數值模式之模擬結果比較。
    試驗結果顯示大溪堰堰址應位於大溪橋下游110m處,而堰頂高程為EL.=80.5m。另外,試驗結果顯示一維性水理數值模式之模擬結果與試驗結果相當吻合。
    This study conducted a model test for the flow in the Dahanshi river after building the proposed Dashi weir and Wulin weir. The test results were also used for the verification of the simulation results of one-dimensional numerical model.
    The test results show that Dashi weir should be located at 110m downstream of the Dashi bridge and the weir elevation is EL.=80.5m. Also, the test results and the one-dimensional numerical results are in good agreements.
    Appears in Collections:[水資源及環境工程學系暨研究所] 學位論文

    Files in This Item:

    File SizeFormat
    0KbUnknown387View/Open

    All items in 機構典藏 are protected by copyright, with all rights reserved.


    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library & TKU Library IR teams. Copyright ©   - Feedback