淡江大學機構典藏:Item 987654321/126357
English  |  正體中文  |  简体中文  |  Items with full text/Total items : 64178/96951 (66%)
Visitors : 9370290      Online Users : 14594
RC Version 7.0 © Powered By DSPACE, MIT. Enhanced by NTU Library & TKU Library IR team.
Scope Tips:
  • please add "double quotation mark" for query phrases to get precise results
  • please goto advance search for comprehansive author search
  • Adv. Search
    HomeLoginUploadHelpAboutAdminister Goto mobile version
    Please use this identifier to cite or link to this item: https://tkuir.lib.tku.edu.tw/dspace/handle/987654321/126357


    Title: Logistical Support Scheduling under Stochastic Travel Times Given an Emergency Repair Work Schedule
    Authors: Lin, Chih-kang
    Keywords: Logistical support scheduling;Stochastic travel time;Emergency repair work schedule;Time–space network;Heuristic
    Date: 2013-10-26
    Issue Date: 2024-10-07 12:05:51 (UTC+8)
    Abstract: Stochastic factors during the operational stage could have a significant influence on the planning results of logistical support scheduling for emergency roadway repair work. An optimal plan might therefore lose its optimality when applied in real world operations where stochastic disturbances occur. In this study we employ network flow techniques to construct a logistical support scheduling model under stochastic travel times. The concept of time inconsistency is also proposed for precisely estimating the impact of stochastic disturbances arising from variations in vehicle trip travel times during the planning stage. The objective of the model is to minimize the total operating cost with an unanticipated penalty cost for logistical support under stochastic traveling times in short term operations, based on an emergency repair work schedule, subject to related operating constraints. This model is formulated as a mixed-integer multiple-commodity network flow problem and is characterized as NP-hard. To solve the problem efficiently, a heuristic algorithm, based on problem decomposition and variable fixing techniques, is proposed. A simulation-based evaluation method is also presented to evaluate the schedules obtained using the manual method, the deterministic model and the stochastic model in the operation stage. Computational tests are performed using data from Taiwan’s 1999 Chi-Chi earthquake. The preliminary test results demonstrate the potential usefulness of the proposed stochastic model and solution algorithm in actual practice.
    Relation: Computers & Industrial Engineering 67, p.20-35
    DOI: 10.1016/j.cie.2013.10.007
    Appears in Collections:[Graduate Institute & Department of Transportation Management] Journal Article

    Files in This Item:

    File Description SizeFormat
    index.html0KbHTML47View/Open

    All items in 機構典藏 are protected by copyright, with all rights reserved.


    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library & TKU Library IR teams. Copyright ©   - Feedback