English  |  正體中文  |  简体中文  |  Items with full text/Total items : 62830/95882 (66%)
Visitors : 4145970      Online Users : 513
RC Version 7.0 © Powered By DSPACE, MIT. Enhanced by NTU Library & TKU Library IR team.
Scope Tips:
  • please add "double quotation mark" for query phrases to get precise results
  • please goto advance search for comprehansive author search
  • Adv. Search
    HomeLoginUploadHelpAboutAdminister Goto mobile version
    Please use this identifier to cite or link to this item: https://tkuir.lib.tku.edu.tw/dspace/handle/987654321/121440


    Title: Sub-Population Genetic Algorithm with Mining Gene Structures for multiobjective FlowShop Scheduling Problems
    Authors: Chang, Pei-Chann;Chen, Shih-Hsin;Liu, Chen-Hao
    Keywords: Genetic algorithms;Multiobjective optimization;Pareto optimum solution;Minging gene structures;Scheduling problem
    Date: 2007-10
    Issue Date: 2021-10-05 12:10:27 (UTC+8)
    Abstract: According to previous research of Chang et al. [Chang, P. C., Chen, S. H., & Lin, K. L. (2005b). Two phase sub-population genetic algorithm for parallel machine scheduling problem. Expert Systems with Applications, 29(3), 705–712], the sub-population genetic algorithm (SPGA) is effective in solving multiobjective scheduling problems. Based on the pioneer efforts, this research proposes a mining gene structure technique integrated with the SPGA. The mining problem of elite chromosomes is formulated as a linear assignment problem and a greedy heuristic using threshold to eliminate redundant information. As a result, artificial chromosomes are created according to this gene mining procedure and these artificial chromosomes will be reintroduced into the evolution process to improve the efficiency and solution quality of the procedure. In addition, to further increase the quality of the artificial chromosome, a dynamic threshold procedure is developed and the flowshop scheduling problems are applied as a benchmark problem for testing the developed algorithm. Extensive tests in the flow-shop scheduling problem show that the proposed approach can improve the performance of SPGA significantly.
    Relation: Expert Systems with Applications 33(3), p.762-771
    DOI: 10.1016/j.eswa.2006.06.019
    Appears in Collections:[資訊工程學系暨研究所] 期刊論文

    Files in This Item:

    File Description SizeFormat
    index.html0KbHTML33View/Open
    Sub-Population Genetic Algorithm with Mining Gene Structures for multiobjective FlowShop Scheduling Problems.pdf322KbAdobe PDF2View/Open

    All items in 機構典藏 are protected by copyright, with all rights reserved.


    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library & TKU Library IR teams. Copyright ©   - Feedback