淡江大學機構典藏:Item 987654321/121411
English  |  正體中文  |  简体中文  |  Items with full text/Total items : 64188/96968 (66%)
Visitors : 11333527      Online Users : 337
RC Version 7.0 © Powered By DSPACE, MIT. Enhanced by NTU Library & TKU Library IR team.
Scope Tips:
  • please add "double quotation mark" for query phrases to get precise results
  • please goto advance search for comprehansive author search
  • Adv. Search
    HomeLoginUploadHelpAboutAdminister Goto mobile version
    Please use this identifier to cite or link to this item: https://tkuir.lib.tku.edu.tw/dspace/handle/987654321/121411


    Title: A parametric analysis for single machine scheduling with past-sequence-dependent setup times
    Authors: Mani, V.;Chang, P. C.;Chen, S. H.
    Date: 2010-03
    Issue Date: 2021-09-30 12:10:34 (UTC+8)
    Abstract: Recently, the single machine scheduling problem with past-sequence-dependent (p-s-d) setup times is getting more attentions from academic researchers and industrial practitioners. The past-sequence-dependent setup times are proportional to the length of already scheduled jobs. It is shown that for a number of objective functions this scheduling problem can be solved in O(n log n) time. In this paper, we extend the analysis of the problem with the total absolute difference in completion times (TADC) as the objective function. This problem is denoted as 1/spsd/T ADC in [1]. Let s[j] and p[j] be the setup time and processing time of a job occupying position j in the sequence respectively, and s[j] is defined as s[j] = γ ∑j−1 i=1 p[i] , where γ is a normalizing constant. In this paper, we present a parametric analysis of γ on the 1/spsd/T ADC problem. We show analytically the number of optimal sequences and the range of γ in which each of the sequence is optimal. We prove that the number of optimal sequences is {1 + ∑x k=1(2k)} if n is odd, and {1+∑x k=1(2k−1)} if n is even. The value of x is b n 2 c−1 when n is odd, and x is n 2 when is even. The number of optimal sequences depends only on n, the number of jobs, and not on γ. We also show analytically that when γ > (n−3) 2(n−2) , the optimal sequence is unique and is obtained by placing the longest job in first position and the rest of the jobs in SPT order in positions 2 to n.
    Relation: International Journal of Innovative Computing, Information and Control 6(3A), p.1113–1121
    Appears in Collections:[Graduate Institute & Department of Computer Science and Information Engineering] Journal Article

    Files in This Item:

    File Description SizeFormat
    A parametric analysis for single machine scheduling with past-sequence-dependent setup times.pdf190KbAdobe PDF1View/Open
    index.html0KbHTML79View/Open

    All items in 機構典藏 are protected by copyright, with all rights reserved.


    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library & TKU Library IR teams. Copyright ©   - Feedback