淡江大學機構典藏:Item 987654321/110392
English  |  正體中文  |  简体中文  |  全文笔数/总笔数 : 62830/95882 (66%)
造访人次 : 4034374      在线人数 : 935
RC Version 7.0 © Powered By DSPACE, MIT. Enhanced by NTU Library & TKU Library IR team.
搜寻范围 查询小技巧:
  • 您可在西文检索词汇前后加上"双引号",以获取较精准的检索结果
  • 若欲以作者姓名搜寻,建议至进阶搜寻限定作者字段,可获得较完整数据
  • 进阶搜寻


    jsp.display-item.identifier=請使用永久網址來引用或連結此文件: https://tkuir.lib.tku.edu.tw/dspace/handle/987654321/110392


    题名: An arithmetic-geometric mean inequality approach for determining the optimal production lot size with backlogging and imperfect rework process
    作者: Chang, Chun-Tao;Ouyang, Liang-Yuh
    关键词: Production;Random defective rate;Failure in repair;Backlogging;Arithmetic-geometric mean inequality
    日期: 2017-02
    上传时间: 2017-06-15 02:10:22 (UTC+8)
    出版者: Shanghai Shifan Daxue,Shanghai Normal University
    摘要: Some classical studies on economic production quantity (EPQ) models with imperfect production processes and complete backlogging have focused on determining the optimal lot size. However, these models neglect the fact that the total production-inventory costs can be reduced by reworking imperfect items for a relatively small repair and holding cost. To account for the above phenomenon, we take the out of stock and repair failures into account and establish an EPQ model with imperfect production processes, failure in repair and complete backlogging. Furthermore, we assume that the holding cost of imperfect items is distinguished from that of perfect ones, as well as, the costs of repair, disposal, and shortage are all included in the proposed model. In addition, without taking complex differential calculus to determine the optimal production lot size and backorder level, we employ an arithmetic-geometric mean inequality method to determine the optimal solutions. Finally, numerical examples and sensitivity analysis are analyzed to illustrate the validity of the proposed model. Some managerial insights are obtained from the numerical examples.
    關聯: Journal of Applied Analysis and Computation 7(1), p.224-235
    DOI: 10.11948/2017015
    显示于类别:[管理科學學系暨研究所] 期刊論文

    文件中的档案:

    档案 描述 大小格式浏览次数
    An arithmetic-geometric mean inequality approach for determining the optimal production lot size with backlogging and imperfect rework process.pdf397KbAdobe PDF2检视/开启
    index.html0KbHTML267检视/开启

    在機構典藏中所有的数据项都受到原著作权保护.

    TAIR相关文章

    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library & TKU Library IR teams. Copyright ©   - 回馈