English  |  正體中文  |  简体中文  |  全文筆數/總筆數 : 62797/95867 (66%)
造訪人次 : 3731491      線上人數 : 651
RC Version 7.0 © Powered By DSPACE, MIT. Enhanced by NTU Library & TKU Library IR team.
搜尋範圍 查詢小技巧:
  • 您可在西文檢索詞彙前後加上"雙引號",以獲取較精準的檢索結果
  • 若欲以作者姓名搜尋,建議至進階搜尋限定作者欄位,可獲得較完整資料
  • 進階搜尋
    請使用永久網址來引用或連結此文件: https://tkuir.lib.tku.edu.tw/dspace/handle/987654321/110392


    題名: An arithmetic-geometric mean inequality approach for determining the optimal production lot size with backlogging and imperfect rework process
    作者: Chang, Chun-Tao;Ouyang, Liang-Yuh
    關鍵詞: Production;Random defective rate;Failure in repair;Backlogging;Arithmetic-geometric mean inequality
    日期: 2017-02
    上傳時間: 2017-06-15 02:10:22 (UTC+8)
    出版者: Shanghai Shifan Daxue,Shanghai Normal University
    摘要: Some classical studies on economic production quantity (EPQ) models with imperfect production processes and complete backlogging have focused on determining the optimal lot size. However, these models neglect the fact that the total production-inventory costs can be reduced by reworking imperfect items for a relatively small repair and holding cost. To account for the above phenomenon, we take the out of stock and repair failures into account and establish an EPQ model with imperfect production processes, failure in repair and complete backlogging. Furthermore, we assume that the holding cost of imperfect items is distinguished from that of perfect ones, as well as, the costs of repair, disposal, and shortage are all included in the proposed model. In addition, without taking complex differential calculus to determine the optimal production lot size and backorder level, we employ an arithmetic-geometric mean inequality method to determine the optimal solutions. Finally, numerical examples and sensitivity analysis are analyzed to illustrate the validity of the proposed model. Some managerial insights are obtained from the numerical examples.
    關聯: Journal of Applied Analysis and Computation 7(1), p.224-235
    DOI: 10.11948/2017015
    顯示於類別:[管理科學學系暨研究所] 期刊論文

    文件中的檔案:

    檔案 描述 大小格式瀏覽次數
    An arithmetic-geometric mean inequality approach for determining the optimal production lot size with backlogging and imperfect rework process.pdf397KbAdobe PDF2檢視/開啟
    index.html0KbHTML262檢視/開啟

    在機構典藏中所有的資料項目都受到原著作權保護.

    TAIR相關文章

    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library & TKU Library IR teams. Copyright ©   - 回饋