淡江大學機構典藏:Item 987654321/105863
English  |  正體中文  |  简体中文  |  全文筆數/總筆數 : 64178/96951 (66%)
造訪人次 : 9526225      線上人數 : 10373
RC Version 7.0 © Powered By DSPACE, MIT. Enhanced by NTU Library & TKU Library IR team.
搜尋範圍 查詢小技巧:
  • 您可在西文檢索詞彙前後加上"雙引號",以獲取較精準的檢索結果
  • 若欲以作者姓名搜尋,建議至進階搜尋限定作者欄位,可獲得較完整資料
  • 進階搜尋
    請使用永久網址來引用或連結此文件: https://tkuir.lib.tku.edu.tw/dspace/handle/987654321/105863


    題名: 表面流人工溼地去除污染物之研究
    其他題名: Pollutants removal in free water surface constructed wetlands
    作者: 陳冠佑;Chen, Guan-You
    貢獻者: 淡江大學水資源及環境工程學系碩士班
    康世芳
    關鍵詞: 表面流人工溼地;盒鬚圖法;出流機率法;Free water surface constructed wetlands;Box and whisker plot;Effluent probability
    日期: 2015
    上傳時間: 2016-01-22 15:07:11 (UTC+8)
    摘要: 本研究評估新北市鹿角溪及打鳥埤人工溼地污染物削減功能,人工溼地包含5個處理單元,水質與流量為2013至2014年之監測資料,研究目的為(1)評估人工溼地污染物削減率、(2)探討污染物入流負荷與去除速率之關係、(3)評估人工溼地處理單元去除污染物。水質項目包含生化需氧量(BOD)、氨氮(NH3-N)、總氮(TN)、總磷(TP)、總大腸桿菌群(TC),此外,以盒鬚圖法(Box and whisker plot)與出流機率法(effluent probability method, EPM)計算污染物削減率。結果顯示鹿角溪人工溼地之水力停留時間與水力負荷分別為19天及0.02 m/day,打鳥埤人工溼地則分別為14天及0.05 m/day。EPM計算BOD、NH3-N、TN、TP與TC之去除率分別為47.5%、99.9%、85.1%、85.6%與97.5%,以盒鬚圖中位數計算去除率之結果與EPM結果亦相近。人工溼地污染物去除速率與污染物入流負荷量呈良好線性關係,BOD、TN、TP、NH3-N及TC之決定係數(R2)為0.87-0.99,其相關性可作為人工溼地設計參數。此外,鹿角溪與打鳥埤人工溼地於第3處理單元,BOD與營養源(TP、TN) 藉水生植栽去除率分別達約50%與70-80%,氨氮因硝化作用與植物吸收致使去除率高達98%。綜合上述,鹿角溪及打鳥埤人工溼地可有效削減污染物,且BOD、營養鹽及TC之去除率分別達約50%、85%與97%。
    This study evaluates the performance of pollutants reduction in Lujiao creek and Daniaopi constructed wetlands (CWs) in New Taipei City. Both CWs contained 5 treatment basins. The data of water quality and flow rate of CWs monitored from 20013 to 2014 was collected. The purposes of this study were (1) to evaluate performance of pollutants reduction by CWs, (2) to examine the relation between influent pollutant loading and removal rate, and (3) to analyze pollutant removals in treatment basins. Water quality items included biochemical oxygen demand (BOD), ammonium nitrogen (NH3-N), total nitrogen (TN), total phosphorus (TP) and total coliform groups (TC). Furthermore, the box and whisker plot median and effluent probability method (EPM) were used to determine the performance of pollutants reduction.
    The result showed that the hydraulic retention time and hydraulic loading rate of Lujiao River CW were 19 days and 0.02 m/day, respectively. Those were 14 days and 0.05 m/day for Daniaopi CW. The removal rates of BOD, NH3-N, TN, TP and TC calculated by EPM were 47.5%, 99.9%, 85.1%, 85.6% and 97.5%, respectively. The removal rates determined by the Box and whisker plot median were almost the same with that by EPM. Pollutant removal rate has a good linear relationship between inflow pollutant loading with determination coefficient (R2) values of BOD、TN、TP ranged from 0.87 to 0.99. Thus, the relationships could be used to design CWs. Moreover, the removal rates of BOD and nutrients (TN and TP) at third basin of CWs could reach to approximately 50% and 70-80%, respectively. Due to nitrification and plants uptake, the removal rate of NH3-N reached up to 98%. It is concluded that Lujiao creek and Daniaopi CWs effectively reduced pollutants and the removal rates of BOD, nutrients and TC about 50%, 85%and 97%, respectively.
    顯示於類別:[水資源及環境工程學系暨研究所] 學位論文

    文件中的檔案:

    檔案 描述 大小格式瀏覽次數
    index.html0KbHTML182檢視/開啟

    在機構典藏中所有的資料項目都受到原著作權保護.

    TAIR相關文章

    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library & TKU Library IR teams. Copyright ©   - 回饋